top of page

HUSSEY BRIDGE REHABILITATION

CLIENT:           RIDOT

LOCATION:    WICKFORD, RI

Hussey Bridge was built in 1925. Aetna Bridge performed this rehabilitation for RIDOT which included 324 CF of structural concrete bridge repairs, 75 SF of masonry repairs with patching mortar, steel beam strengthening, carbon fiber wrap (FRP) repairs, and other bridge preservation items such as 8,300 SF of concrete coatings to the bridges arches, bridge painting, bridge washing and maintenance and protection of traffic.

Completed 9 months early and on budget.

bottom of page